Bentley Bay Marina

  • After

  • During

  • Before

  • Before

Project Overview

Project Location

1540 West Avenue,
Miami Beach. Florida,
33139

Owner's Representative

Cummins | Cederberg
50 S US Hwy 1 , Suite 308
Jupiter, FL 33477

Construction Dates

  • Start: 11/17/2016

  • Finish: 8/30/2017

Contract amount

  • $1,253,000.00

This project involved the installation of a 16-slip concrete docking facility, featuring a T-shaped dock with associated finger piers and an L-shaped dock. The docks are connected to upland gangways, each measuring 40 feet long by 4 feet wide, with railings and stairs for access. The T-shaped dock includes a 178-foot-long by 6-foot-wide access walkway (1,068 square feet), with two piers extending 36 feet long by 4 feet wide (144 square feet each) from the walkway, creating a functional and spacious docking area.