City of Miami Beach Seawalls

Project Overview

Project Location

Lincoln Ct., Bay Rd.,
Dade Blvd., West Ave, Indian Creek Dr.,
Cherokee Ave., Normandy Shores Park, Maurice, Gibb Park, Miami Beach, Florida

Owner's Representative

City of Miami Beach
Public Worker Department,
Engineering Division
1700 Convention Center Drive
Miami Beach, FL 33139

Construction Dates

  • Start:  2015

  • Finish: 2017

Contract amount

  • $5,500,000.0

This project involved the fabrication and installation of robust pre-cast concrete seawall panels, each measuring up to 14 feet in length, 10 feet in width, and 9 inches thick. The installation included 14” x 14” concrete piles extending 35 feet deep, providing a solid foundation for a 2-foot by 1.33-foot concrete seawall cap. To further strengthen the structure, riprap boulders were strategically placed, enhancing both stability and shoreline protection. This comprehensive work showcases a blend of engineering precision and coastal resilience.