Icon Marina Village
Project Overview
Project Location
4400 N Flagler Drive
West Palm Beach, FL 33407
Owner's Representative
Balfour Beatty Construction, LLC
7901 SW 6th Court, Ste 200
Plantation, FL 33324
Construction Dates
Start: 03/10/2021
Finish: 09/01/2022
Contract amount
$1,671,961.00
The Icon Marina Village project involved the construction of a 615-foot seawall and a 10’ x 250’ floating dock. With multiple high-rise residential buildings being constructed simultaneously by other contractors, all marine activities were conducted via barge. The project began with the demolition and removal of existing upland and marine structures, followed by the construction of a 615-foot seawall using HZ king piles and NZ-26 and NZ-19 sheet piles, capped with a 2-foot high concrete cap. The seawall was protected by underwater riprap boulders, while a groin section was bordered by a new riprap mangrove planting area. Upland riprap breakwaters were installed to safeguard the beach. After offsite fabrication, MarineTek Floating Docks were delivered and installed, completing the project.